Mixer Shaft Assembly - West London
| |
The ProblemMJM Industrial was called in when a bakery encountered a problem with a broken cast iron 500kg Mixer shaft assembly. The Machine manufacturer had quoted 16 weeks delivery for a replacement part.
|
 |
|
Mixer Shaft Assembly
|
|
Our SolutionMJM Industrial fabricated a steel replacement part in 2 days. This minimised downtime for this important machine and ensured factory production continued to meet output demands.
|
|
|
Return to case studies or contact us with your requirements.