Removal Of Bridge Advertising

Ad Sign Before v1

Challenges

A light box situated on a bridge above the main entrance and exit road to Heathrow terminals needed to be removed for urgent repairs. The work was challenging as the information on the original construction was limited, and the road could only be fully closed for short intervals to enable vehicle access to the terminals.

Brief

  • Survey the site and recommend a solution, including site specific risk and method statements
  • Bespoke programme management to ensure successful interface with HAL landside operations team
  • Carry out the works and make good the site
  • Minimise disruption to traffic accessing the terminals

Solution

The project was delivered safely, on time, and on budget. MJM Industrial carried out the following work to complete the project:

  • Structural survey of the installation
  • Electrical strip out
  • Mechanical strip out
  • Multiple work permits
  • Traffic Management
  • Elevated Work Platform

See more case studies here.