A number of handrails in a Heathrow baggage area needed strengthening to provide better resilience against accidential collisions from baggage bins.
Read MoreMJM Industrial worked in collaboration with the lead contractor to replace leaking pipe work in the ceiling cavity above the Air New Zealand office in T2.
Read MoreThe client requested the support of MJM Industrial’s electrical engineers to upgrade the lights used above the passenger check-in desks at Heathrow.
Read MoreThe lead contractor asked MJM Industrial to enhance and upgrade the T2 airside smoking shelter to improve the customer experience for passengers.
Read MoreThe client asked MJM Industrial to renovate the Baggage Recovery Facility in Terminal 5 by installing heating, lighting, and ventilation.
Read MoreA Tier 1 Heathrow contractor required mechanical and electrical engineers to support the delivery of vital works to extend the life of Heathrow Terminal 1.
Read MoreRe-fit of a 430 square metre office in Welwyn Garden City for a marketing agency, from specification to delivery, and managing all aspects of the build.
Read MoreProviding dedicated on-premise service delivery of parts ordering and stock control to support the continuous operation of print production lines.
Read MoreA staff restroom at Heathrow was no longer being used by employees due to its poor condition. MJM Industrial was asked to carry out a full re-fit.
Read MoreTo install infrastructure to allow advertisers to showcase their brands using the latest generation of digital screens to reach the Heathrow Rail audience.
Read MoreA lightbox situated on a bridge above the main entrance and exit road to Heathrow terminals needed to be removed for urgent repairs.
Read MoreThe chilled water pipework in the ceiling above Singapore Airlines office needed replacing, with widespread water damage to ceilings and walls.
Read MoreHeathrow Baggage Operations needed to improve resilience during incidents that prevent bags passing through the baggage system.
Read MoreProvide additional protection to load docks, to ensure the safety of baggage operators and prevent disruption to baggage operations.
Read MoreTo create a new airside parking area at Heathrow T3 by clearing the identified location and installing new infrastructure in compliance with HAL standards.
Read MoreHeathrow Terminal 1 load decks needed upgrade works to improve the health and safety of operators and the efficiency of loading bags into containers.
Read MoreOur client required new infrastructure in their warehouse to use space more efficiently and provide better working conditions for their staff.