Case Studies

Filter:  All  |  Electrical  |  Engineers  |  Fabrication  | Airport  |  HVAC  |  Infrastructure  |  Parts  |  Fit Out

Pipework & Office Refurbishment

Air New Zealand Header

MJM Industrial worked in collaboration with the lead contractor to replace leaking pipe work in the ceiling cavity above the Air New Zealand office.

Read More

Airport Baggage Recovery Facility

Main Hall v3

MJM Industrial renovated the Baggage Recovery Facility in this airport terminal by installing heating, lighting and ventilation.

Read More

Office Fit Out For Agency

Fit out of a 430 square metre office in Welwyn Garden City for a marketing agency, from specification to delivery, and managing all aspects of the build.

Read More

Airline Office Pipework Replacement

The chilled water pipework in the ceiling needed replacing due to widespread water damage to ceilings and walls.

Read More