Filter: All | Electrical | Engineers | Fabrication | Airport | HVAC | Infrastructure | Parts | Fit Out
MJM Industrial worked in collaboration with the lead contractor to replace leaking pipe work in the ceiling cavity above the Air New Zealand office.
Read MoreFit out of a 430 square metre office in Welwyn Garden City for a marketing agency, from specification to delivery, and managing all aspects of the build.
Read MoreAn airport staff restroom was no longer being used by employees due to its poor condition. MJM Industrial was asked to carry out a full re-fit.
Read MoreThe chilled water pipework in the ceiling needed replacing due to widespread water damage to ceilings and walls.
Read MoreOur client required new infrastructure in their warehouse to use space more efficiently and provide better working conditions for their staff.
Read More