Case Studies

Filter:  All  |  Electrical  |  Engineers  |  Fabrication  | Airport  |  HVAC  |  Infrastructure  |  Parts  |  Fit Out

Pipework & Office Refurbishment

Air New Zealand Header

MJM Industrial worked in collaboration with the lead contractor to replace leaking pipe work in the ceiling cavity above the Air New Zealand office.

Read More

Office Fit Out For Agency

Fit out of a 430 square metre office in Welwyn Garden City for a marketing agency, from specification to delivery, and managing all aspects of the build.

Read More

Airport Staff Restroom

Kitchen Worktop

An airport staff restroom was no longer being used by employees due to its poor condition. MJM Industrial was asked to carry out a full re-fit.

Read More

Airline Office Pipework Replacement

The chilled water pipework in the ceiling needed replacing due to widespread water damage to ceilings and walls.

Read More

Warehouse & Communal Areas

Mezzanine Floor Warehouse

Our client required new infrastructure in their warehouse to use space more efficiently and provide better working conditions for their staff.

Read More