Baggage Load Docks Upgrade

New Platform v1

Challenges

The client requested a number of improvements to load decks within this airport terminal to improve the health and safety of their operators and the efficiency of loading bags into containers.

Brief

Remove existing infrastructure and install new baggage build stations raised from floor level, with steel ball transfer units, pneumatic operated stops, and safety walkways.

Solution